Comprehensive factory and site acceptance tests include: filter integrity, particle count (air cleanliness), downflow velocity and uniformity, exhaust velocity/volume, containment zone verification, noise level, light intensity, temperature rise and electrical safety.
Containment performance verified according to the ISPE Good Practice Guide, Assessing the Particulate Containment Performance of Pharmaceutical Equipment.
Options
Bag-in bag-out filter housings for safe filter change.
Total exhaust airflow.
Built-in cooling coils to offset booth temperature rise.
Facia cavities for computers, screens, printers.
Front PVC strips.
Services such as N2, water, compressed air.
Network connections.
Containment screen for high-containment applications.
Integral equipment such as drum lifters.
Hazardous area applications.
Temp and humidity control systems.
Entry and exit airlocks.
Touchscreen and digital pressure alarms in lieu of switches and pressure gauges.
Project Process Flow
Project Lead Received
Initial Contact by Esco Technical Sales Engineer On-Site Visit to Determine Customer Needs.
First Proposal Submitted Complete With Submittal Drawings and Quote.
Follow Up Visit(s) and Refinement(s) to Requirements.
Final Proposal Submitted, Agremeent on Commercial Details.
Customer Issues Purchase Order.
Mechanical and Electrical Engineering at Esco.
Customer Approval of Design and Drawings.
Fabrication and Assembly.
Integration of Externally Sourced Equipment (If Required).
Factory Acceptance Test at Esco with Documentation.
Packaging and Transport.
Field Service Installation and Site Acceptance Test.
Comprehensive factory and site acceptance tests include: filter integrity, particle count (air cleanliness), downflow velocity and uniformity, exhaust velocity/volume, containment zone verification, noise level, light intensity, temperature rise and electrical safety.
Containment performance verified according to the ISPE Good Practice Guide, Assessing the Particulate Containment Performance of Pharmaceutical Equipment.